DC Renovations Dan Chidsey. Did not completely finish the job. Joliet IL

  • Reported By:
    George — Joliet IL United States
  • Submitted:
    Sun, July 16, 2023
  • Updated:
    Wed, July 19, 2023

We had the contractor remodel both bathrooms.  The main part of the work was finished, but there were touch-ups and repairs to things that got damaged that needed to be worked on.  He advised me to take a week to make a list of what needed to be done and he would get his people back here to do the work.  Twice after that he said he would come the following week.  Then he simply quit responding to my texts, phone calls, and facebook messages.

There was a crack in the threshold on the new shower.  They had taken off the bathroom doors and used one of them as a table and then put two holes in the door, one small one and one large one.  The openings in the walls where the pipes went through were never sealed.  The heat register in the bathroom was not secured.  Just a few examples of the work they were supposed to come back to fix.

It has been over 7 months now.