Print the value of index0
  • Report:  #981091

Complaint Review: General Steel Corp

General Steel Corporation REVIEW: General Steel employees committed to complete customer satisfaction. General Steel approach to business is focused on providing the highest customer satisfaction in the industry, thousands satisfied. General Steel customers reviews attest to General Steel high standard of excellence. Littleton Colorado, Nationwide


*UPDATE: General Steel pledges their commitment to always improving their operations by joining Ripoff Report Corporate Advocacy, Business Remediation and Customer Satisfaction Program. A program that benefits the consumer by increasing their confidence when doing business with a member business. General Steel recognized by Ripoff Report Verifiedâ„¢ as a safe business service

  • Reported By:
    Steve — Herrin Illinois United States of America
  • Submitted:
    Wed, December 12, 2012
  • Updated:
    Wed, December 12, 2012
  • General Steel Corp
    10639 Bradford Rd Ste 200
    Littleton, Colorado
    United States of America
  • Phone:
    800-406-5126
  • Category:

I was told engineering would take 2 to 3 weeks, then it changed to 6 weeks after I gave deposit *I was told that fabrication would be 5 to 6 weeks, then it changed to 8 to 10 weeks after I gave the deposit *I was told that this project would take 3 months to completion, after the deposit I was told 3 to 4 months just to receive the steel *When I expressed concern about the clause in the signed specifications document stating "time is not of the essence", I was told not to worry as General Steel would deliver the building quickly because they don't get paid until I have my building *I was led to believe that General Steel is the manufacturer and they are not *I was provided an initial proposal for erection and all completion of $105,000.00 and told we would then get a minimum of 4 bids which were due 6/22/2012. I only received 2 bids and the lowest bid was more than double the proposal at $279,500.00 *I was told that we would not include the doors and windows in the engineering as that would be a "simple field fit" only to turn around and have a project coordinator try to upcharge me for doors, windows, gutters and downs as extras *I was then sent an email suggesting that I sign a waiver and shipping paperwork to expedite my order I refused to sign the waiver and demanded a refund and that was the last word I heard from General Steel

Respond to this Report!