Mr Daniel Baltudis aka GreenGo Inc aka Iguana Design Inc aka Architectural Surfaces was retained in April to do a tear out of 33 E Cedar condo 9c and 9d (not 9e). Initial granite selection took place at Stone City International Marble in August (not late July).
Regarding Mr Baltudis claim to be a licensed architect herewith are the facts as we understand them. Mr Baltudis, during a personal face to face visit with us on September 11, was explicitly asked about his architect credentials . He showed us
document/s which appeared to attest that Mr Baltudis was indeed a licensed architect. As a follow up to that meeting, I wrote Mr Baltudis a memorandum of understanding and thanked him for showing us credentials that he was a bonafide architect. I asked him to correct in writing any misunderstanding that I had respecting his claims and representations, in particular that he was an architect.
Mr. Baltudis responded to this memo in writing that we misunderstood something about the bathroom sink but remained silent about our understanding that he is an architect.
It was our understanding that Mr Baltudis lied about a $15000 payment to Chicago based Studio 41. This understanding was based on his presentation on Sept 11 of an official looking receipt that showed a total figure of $15000. It was later
that we gained access to the actual Studio 41 accounts for the Cedar Project which showed Mr Baltudis had made 2 different purchases/ credit card charges for semi-custom cabinets which together totaled about $9900. Studio 41 had NO record of a $15000 payment under the name of GreenGo, Inc or Daniel Baltudis. Indeed Mr. Baltudis assured me that the
additional cabinet designs were submitted to Studio 41 for construction on about Monday August 29. In reality Mr Baltudis placed the order on Sept 6 2011 thus delaying finished cabinet delivery another week.