41, Report:
#1519901
Posted Date:
Jul 20 2022
Cabovillas.com Alex Koenig | Senior Cabo Specialist CaboVillas.com Posted my honest review with details of the stay on Cabovillas.com After 36hrs i noticed that my review was not approved by CaboVillas.com. No response or follow up to this day. Watsonville California
Longer description of what happened.Posted my honest review with details of the stay on Cabovillas.com After 36hrs i noticed that my review was not approved by CaboVillas.com. No response or follow up to this day.So i contacted them using their webpage Online chat, After providing t...
Entity
Cabovillas
Categories: Review Censorship
42, Report:
#1519596
Posted Date:
Jul 07 2022
Camping World Longmont Over charged on taxes and no tile release Longmont Colorado
Absolutely the worst buying experience I have ever had purchasing a vehicle.
First our salesman Shawn N. ghosted us after he got the down payment. We drove from Florida to Longmont to meet him at an agreed time and he did not even show up. Later I called him a couple of times wit...
Entity
Camping World Longmont
Categories: RV Dealers
43, Report:
#1519417
Posted Date:
Jun 30 2022
National Floors Direct Stole my cash and didnot do work Pompano Beach Florida
Contracted this company to remove tile bathroom floor and sub floor and replace it with a new sub floor and vinyl flooring. When installer arrived he said to first pay him the balance in cash or certified check before he began the work. I told him the balance was financed. He cal...
Entity
National Floors Direct
Categories: Flooring
44, Report:
#1518833
Posted Date:
Jun 17 2022
Empire Flooring Tore out existing ceramic tile and carpet, replace with luxury vinyl plank flooring. Orlando Florida
The installer broke bathroom floor ceramic tile in the entrance where the transition fron hallway to bathroom is. They didn't clean up all of the tac strip nails from the carpet removal, they layed the luxury vinyl plank floor over the top of them and they are now working their way ...
Entity
Empire Flooring
Categories: Flooring
46, Report:
#1518846
Posted Date:
Jun 04 2022
SLA Builder's Sean Anderson Does not Pay there Sub Contractors Zephyr Texas
I own a remodeling company I was called by Sean Anderson owner of SLA Builders and asked if I would lay Large Format Tile on shower walls, and tub surround, when we talked Sen said all the material was at the job site, upon arrival to the job site all material was not there, so on...
Entity
SLA Builder's
Categories: Construction/labour unpaid
47, Report:
#1518746
Posted Date:
May 31 2022
McKenna Property Management McKenna Property Mgmt billed me over $13,000 for normal wear and tear plus added on fake charges Las Vegas Nevada
McKenna Property Management We rented a house from March 2019 to April 2022. My friends and I spent 10 days making sure new light bulbs were installed, everything was cleaned, leaves and landscaping raked, etc. McKenna property sent me a bill for over $13,000!!!! They kept my securi...
Entity
McKenna Property Management
Categories: Made up charges for repairs and cleaning
48, Report:
#1518629
Posted Date:
May 25 2022
Pelican Design & Construction, LLC Red Rock Design & Construction, LLC Took money and did not complete more than 33% of the job. Dallas Texas
I paid Eric Reynolds, a local DFW contractor, to renovate a
house I purchased last year to live in.
.
I have a contract and copies of the checks, last one dated
November 30th, 2021.
He stated he was the owner of Pelican Design and
Construction ,alicensed contractor and that he neede...
Entity
Pelican Design & Construction
Categories: Contractor Scam
49, Report:
#1518315
Posted Date:
May 11 2022
The Hotel Sync The Hotel Sync in Bowling Green Ky should be named The Hotel Scam Bowling Green Kentucky
I stayed here one after reading the positive reviews obviously posted by the owner. Room was dirty and very basic, with no carpet or tile; no soap or other toiletries as you would expect in a hotel at this price. However the real problem is the scam artist owner. I prepaid the...
Entity
The Hotel Sync
Categories: hotel
50, Report:
#1510612
Posted Date:
May 05 2022
Taskforce NTX Remodel 5 x 8 bathroom Plano Texas
This is the contents of the Default Letter that was sent to Taskforce NTX co-founder and V.P. of Construction.
Please be advised that your company is in default of the signed contract dated on May 27, 2021 and you and your company have failed to provide the following:
(1) Produce a ...
Entity
Taskforce NTX
Categories: bathroom shower resurfacing, Construction, remodeling