The siding was installed with absent care. See above description and his website.
There is a lot of stormwater damages, mold and mildew. The interior stairwell has a musty stench after it rains.
Mr. Dec could not justify an invoice that he created on an account ledger for materials that don't exist in the amount of $24, 000.There were no vinyl cedar shakes, no 16" PVC and there was no equipment rental. FFCA, learned from an audit that the permit cost $865 and FFCA was billed and paid Mr. Dec $1200.
Mr. Dec serves himself. He carried no insurance. Mr. Dec resigned as property manager at FFCA before facing consequences of trial..