1, Report:
#651520
Posted Date:
Oct 16 2010
Right Way Constructs Brandon Electric Started Kitchen but Stopped Philadelphia, Pennsylvania
The project started to go bad when after demolition, the electrical was not completed, the plumbing was never completed, the floor was not made level and incorrectly-leaving large gaps between the tile and floor (not removing trim), then the walls were not patched or smoothed and th...
Entity
Right Way Constructs
Categories: Kitchens