I hires Dustin to build a two car, one bedroom addtion along with replacing the roof onto my home for $21,000. I got a roof installed, windows replace in my home, a half installed tankless hot water heater and a footing for the addtion. I paid out over $23,000 to him and the garage and room addtion is still not complete. At last I saw him I gave him $4,000 in addtion to the $23,000 I had already paid him for concrete work to be completed. Suposedly he had already bought all of the rest of the materials to complete the project minus forgetting to estimate the cost of the foundation. The stem wall was put in and I never heard from him again. He did not pay any of the sub contractors. I am out the $4000 I paid him plus all the materials I thought were paid for. Plus I had to pay all the concrete people $6,000 to finish the foundation. Now I have to hire another contractor to complete the structure. In addtion he: